Tuesday 14 June 2016

FRONT DOOR, CAVITY SLIDER FRAMES, SHOWER NICHES AND MORE EAVES

Front Door was installed end of last week along with the Shower niches and the cavity slider frames.
Eaves are 90% done now just across the front to be finished off which was being done this morning when I drove past.


Can't wait to see changes once gyprock and Garage door installed.
















Thursday 9 June 2016

PROGRESS UPDATE - INSULATION

Had site visit with SS on Friday to check electrical all ok before they begin installing insulation and plasterboard.


Only 2 p/points that needed to be moved and a gas point.


Insulation started early this week and eaves started yesterday.
Front door on site ready to be installed.


Spoke with SS yesterday and gyprocker is behind so probably wont get to our job till mid next week.


Had a small problem arise with the stairs from the laundry - MJH had drawn them wrong but has now been rectified at no cost to us.


Acoustic insulation is only installed on internal walls not walls that are external so waiting on reply from email sent to MJH today in relation to this. At no point were we advised this is the practice and considering our master bedroom consists of 2 brick walls and 1 wall of glass doors the only points of acoustic insulation are on the two small walls of the WIR - pretty much a waste of acoustic insulation which had we been made aware would have used it in another room.