Thursday 9 June 2016

PROGRESS UPDATE - INSULATION

Had site visit with SS on Friday to check electrical all ok before they begin installing insulation and plasterboard.


Only 2 p/points that needed to be moved and a gas point.


Insulation started early this week and eaves started yesterday.
Front door on site ready to be installed.


Spoke with SS yesterday and gyprocker is behind so probably wont get to our job till mid next week.


Had a small problem arise with the stairs from the laundry - MJH had drawn them wrong but has now been rectified at no cost to us.


Acoustic insulation is only installed on internal walls not walls that are external so waiting on reply from email sent to MJH today in relation to this. At no point were we advised this is the practice and considering our master bedroom consists of 2 brick walls and 1 wall of glass doors the only points of acoustic insulation are on the two small walls of the WIR - pretty much a waste of acoustic insulation which had we been made aware would have used it in another room.
















4 comments:

  1. Had the same issue.. i realised when i got the updated plans as a result of the dark shaded walls in the master bedroom.

    ReplyDelete
    Replies
    1. Did you pay for more Acoustic Insulation or have you just left it?

      Delete
    2. i was able to catch it prior to contract so was able to change it.

      Delete
  2. Had the same issue.. i realised when i got the updated plans as a result of the dark shaded walls in the master bedroom.

    ReplyDelete